EV road trip

Bengaluru to Madikeri EV Road Trip

Charging plan computed October 12, 2026
By Arun Singh, Destinations Writer, TripmojoReviewed by Simran Raheja

Bengaluru to Coorg is where a south Indian EV trip stops being trivial. The first half, out to Mysuru, is the easy expressway run. After that the road narrows, the charging thins out noticeably, and past Kushalnagar it climbs up to Madikeri.

None of that makes it hard. It makes it a route where the decision that matters happens early, in Mysuru, long before anything difficult starts.

Coorg in the Western Ghats, the destination of this EV road trip from Bengaluru

250 km

Distance

5 hr 3 min

Drive time

34 min

Charge time

1

Charging stops

Distance and drive time are the route. Charge time and stops are for Tata Nexon EV LR specifically - the stations below are what exists on the road, whatever you drive.

The climb into Kodagu after Kushalnagar adds roughly 12% battery drain; chargers are sparse past Mysuru.

Charging stations on the Bengaluru to Madikeri route

The 23 public chargers we have within 5 km of the route between the two cities, in the order you pass them. Stations inside Bengaluru and Madikeri themselves are left out. This list does not depend on what you drive - it is the charging infrastructure on the road itself. Tap any station for driving directions.

Zeon Charging Station

Zeon Charging · CCS2 50 kW

Bengaluru · on the highway · Known charging network

Directions
16 km

BMW Charging Station

BMW Charging Station

Bengaluru · on the highway

Directions
26 km

ChargeZone Charging Station

ChargeZone · CCS2 50 kW

Bidadi · on the highway · Known charging network

Directions
29 km

BESCOM Charging Station

BESCOM Charging Station

Ramanagara · 2.8 km off the highway

Directions
54 km

Statiq Charging Station

Statiq · CCS2 50 kW

Monnageri · on the highway · Known charging network

Directions
58 km

Adani Charging Station

Adani · CCS2 50 kW

Madikeri · on the highway · Known charging network

Directions
59 km

BMW Destination Charging Station

BMW Destination Charging Station

Madikeri · on the highway

Directions
59 km

BESCOM Charging Station

BESCOM Charging Station

Channapattana · 1.9 km off the highway

Directions
62 km

Electric Vehicle Charging Station

Electric Vehicle Charging Station

Madikeri · on the highway

Directions
63 km

Zeon Charging Station

Zeon Charging · CCS2 50 kW

Channapattana · on the highway · Known charging network

Directions
65 km

Bolt.Earth Charging Station

Bolt.Earth Charging Station

Mudagere · on the highway

Directions
66 km

Statiq Charging Station

Statiq · CCS2 50 kW

Mudagere · on the highway · Known charging network

Directions
67 km

Zeon Charging Station

Zeon Charging · CCS2 50 kW

Mudagere · on the highway · Known charging network

Directions
68 km

Charge_iN by Mahindra Charging Station

Charge_iN by Mahindra Charging Station

Nidaghatta · on the highway

Directions
73 km

Electric Vehicle Charging Station

Electric Vehicle Charging Station

Mekeri · on the highway

Directions
74 km

Hyundai Charging Station

Hyundai Charging Station

Mysuru · on the highway

Directions
93 km

Statiq Charging Station

Statiq · CCS2 50 kW

Manchedevanahalli · on the highway · Known charging network

Directions
98 km

Statiq Charging Station

Statiq · CCS2 50 kW

Piriyapatna · on the highway · Known charging network

Directions
104 km

Zeon Charging Station

Zeon Charging · CCS2 50 kW

Mysuru · 4.1 km off the highway · Known charging network

Directions
135 km

Zeon Charging Station

Zeon Charging · CCS2 50 kW

Metagalli · 4.4 km off the highway · Known charging network

Directions
135 km

Zeon Charging Station

Zeon Charging · CCS2 50 kW

Hutagalli · on the highway · Known charging network

Directions
144 km

Tata Power Charging Station

Tata Power · CCS2 50 kW

Madikeri · on the highway · Known charging network

Directions
221 km

Zeon Charging Station

Zeon Charging · CCS2 50 kW

Baichanalli · on the highway · Known charging network

Directions
223 km

Distances are measured along the route from Bengaluru. Station data comes from charge point operators and Open Charge Map and can lag reality - check the operator app before relying on any single one.

A worked example: Tata Nexon EV LR

Which of those stations you actually need depends entirely on your car. Here is the plan for Tata Nexon EV LR leaving at 80% charge, as a worked example - not a recommendation for every EV. Re-run it below for yours.

1. Zeon Charging Station

Zeon Charging · CCS2 50 kW

Arrive 32% · leave 65% · on the highway

Known charging network

Directions
~34 min
A public DC fast charger with two connector cables

What Bengaluru to Madikeri costs in an EV

₹322

Charging bought on the way

₹1,665

Same trip on petrol

These two are not a like-for-like saving and we are not going to present them as one. The ₹322 covers the 14.7 kWh you buy at public chargers en route; the energy you set off with is not priced here, and it is cheaper than public rates if you charged at home. The petrol figure covers the whole distance. Assumes ₹22 per kWh at public DC chargers, petrol at ₹100 per litre and 15 km per litre. Tolls are the same either way and are not included.

Apps to install before you leave

Each charging network starts sessions through its own app. Install and register these before you go - signing up at the charger, on patchy highway data, is how a twenty-minute stop becomes an hour.

  • Zeon for Zeon Charging chargers

Charge in Mysuru, not after it

The single most useful thing on this corridor is to arrive in Mysuru and top up properly even if you do not feel you need to. Charging density drops off past it: Hunsur and Kushalnagar both have fast charging before the climb, and Madikeri has public units too, but these are individual stations rather than the multi-bay hubs you have been passing, and in peak season they can have a wait.

It is the same shape of decision as charging before a closed expressway: the point is not that you cannot reach the next charger, it is that you want options if the next charger disappoints you.

The climb after Kushalnagar

The road up from Kushalnagar to Madikeri is a proper hill climb - Kushalnagar is already in Kodagu, so this is the climb to the hill town rather than into the district. Expect your per-kilometre consumption to roughly double while you are on it. How much of your battery that actually costs depends heavily on your pack: the same climb that takes a tenth of a large battery can take a fifth of a small one.

Coorg is also not a single destination. Madikeri, the homestays scattered through the coffee estates, and the viewpoints beyond are all further driving on hill roads once you arrive, and hill roads at low speed still consume more than flat roads do. Budget for the driving you will do there, not just the driving to get there.

Homestay charging is the real answer

Most people going to Coorg stay in a homestay or estate property rather than a highway hotel, and increasingly those have a plug. That is worth asking about when you book, because a slow overnight charge where you sleep solves this route completely and costs almost nothing.

If you cannot charge where you stay, Madikeri has public fast charging and Kushalnagar has more on the way back down. The descent itself returns some charge too. None of that is a substitute for arriving with enough, but it does mean you are not stranded if the homestay plug does not materialise.

Can Tata Nexon EV LR do Bengaluru to Madikeri without stopping?

No - plan 1 charging stop along the way.

Frequently asked questions

Can you drive an EV from Bengaluru to Coorg?

Yes, and the first half is easy. The parts to plan for are thinner charging past Mysuru and the climb from Kushalnagar up to Madikeri. Topping up properly in Mysuru makes the whole route straightforward.

Where is the last good place to charge before Coorg?

Mysuru, comfortably. Coverage past it drops off in our route data and the hill stations are smaller and more easily occupied. There is charging at Kushalnagar before the climb, and Madikeri itself has public fast charging, but none of it is as quick or as certain as topping up in Mysuru while you are already there.

How much battery does the climb to Madikeri use?

Per-kilometre consumption roughly doubles on the climb from Kushalnagar. As a share of your battery it depends entirely on pack size - a small battery feels the same climb roughly twice as hard as a large one. You get some of it back on the descent when you leave.

Is there EV charging in Madikeri and around Coorg?

Madikeri town has public fast charging, and there is more at Kushalnagar on the way in. It is still far less dense than the highway behind you and more easily occupied, so for most visitors the calmer answer is charging at the homestay or estate they are staying at - worth asking about when booking.

Do you need to plan for driving around once you are in Coorg?

Yes, and people routinely forget to. The estates, viewpoints and towns are spread out and connected by hill roads, which consume more than flat ones. Arriving with just enough to have got there is not the same as arriving with enough.

How we plan this route

  • The car. Every figure above is calculated for Tata Nexon EV LR, using its real-world highway consumption rather than its claimed range. A different car gives different stops, which is what the planner is for.
  • The chargers. Station locations, connector types and power ratings come from charge point operator data and Open Charge Map, refreshed on a schedule. Stops are picked for DC fast charging on or near the route, not for the shortest raw distance.
  • The charging maths. At each stop we add only what the next leg needs plus a margin, and never take the battery above 80 percent, because DC charging slows sharply beyond that. That is why a stop can be short and leave you well under 80 - it is deliberate, not a shortfall. We also hold a reserve for arrival rather than planning you down to empty.
  • What we cannot see. Live queues, a charger that went down this morning, and your own driving speed. Treat the plan as a good starting point and check availability in the operator app on the day.

Charging plan on this page computed October 12, 2026 and refreshed automatically.

Drafted with AI assistance, then reviewed by Simran Raheja before publishing.

Your next trip is one email away

Solo getaway, family holiday or group trip.